How the quantities are worked out
Wet plaster = area × thickness. Dry mortar = wet plaster × 1.33, plus your wastage.
Cement bags = dry mortar ÷ (1 + sand parts) ÷ 0.0347. Sand = dry mortar × sand parts ÷ (1 + sand parts).
Example: 100 m² at 12 mm is 1.2 m³ wet, or 1.38 m³ with 15% extra. Dry, that is 1.84 m³. At 1 : 4, cement is 0.37 m³ or about 10.6 bags, and sand is 1.47 m³.
Rough brickwork takes more than smooth blockwork, so raise the extra if your walls are out of line. Thickness and mix are common site practice. Your engineer’s specification comes first.
Questions people ask
How much cement is needed for 100 sq ft of plaster?
What thickness of plaster is used?
Why add 15% extra?
Related free tools
Put these numbers to work
Find freelance projects and jobs with the salary shown, or hire verified talent. Zero commission (fees compared with Upwork, Fiverr and others).